Obligations under the Environment Protection and Biodiversity Conservation Act 1999

get acrobat reader   All documents are pdf files and require acrobat reader to view

The pulp mill project was approved under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) on 4 October 2007. The approval conditions require the preparation of an Environmental Impact Management Plan (EIMP) for approval by the Commonwealth Minister for the Environment, Heritage and the Arts. The approval allows the EIMP to be submitted and approved in sections.

The following sections (referred to as modules) provided below for public information have been approved by the Minister.

Modules A and B were approved on 1 February 2008, with Module C approved on 2 April 2008. Module E was approved 23 May 2008.

Modules C1, D, FGHK, IJ and O were approved on 5 January 2009.

Letter to Gunns from Environment Minister 05 Jan 2009

 

FILE SIZE
EIMP Module A – Overview 1.2 MB
  • 40 kB
  • 48 kB
  • 100 kB
EIMP Module B – Mill site vegetation clearing 200 kB
  • 100 kB
  • 948 kB
  • 88 kB
  • 524 kB
  • 2 MB
  • 264 kB
  • 368 kB
  • 304 kB
  • 8.2 MB
EIMP Module C – Mill site bulk earthworks 192 kB
  • 96 kB
  • 80 kB
  • 2 MB
  • 364 kB
  • 432 kB
  • 1.4 MB
EIMP Module C1 – Mill construction 3.2 MB
  • 96 kB
  • 72 kB
  • 768 kB
EIMP Module D – Wharf construction 1.3 MB
  • 96 kB
  • 76 kB
  • 1 MB
EIMP Module E – Accommodation facility construction 724 kB
  • 96 kB
  • 60 kB
EIMP Module FGHK – Pipeline construction 4.4 MB
  • 96 kB
  • 136 kB
  • 28kB
  • 8 MB
  • 8 MB
  • 8.9 MB
  • 9 MB
  • 5.MB
  • 488 kB
  • 2.3 MB
  • 3.9 MB
  • 4.5 MB
  • 1.5 MB
  • 36 kB
  • 512 kB
EIMP Module IJ solid waste disposal and local reservoir construction 2.2 MB
  • 92 kB
  • 72 kB
  • 108 kB
  • 44 kB
EIMP Module O Habitat Offsets and Reserves 4.2 MB
  • 96 kB
  • 56 kB
  • 3.9 MB
  • 5.7 MB
  • 852 KB
In relation to the following modules (L, M and N) the Minister has advised Gunns that he requires the results of the hydrodynamic modelling required under condition 38 of the approval to be incorporated into the EIMP before he can approve them as a complete EIMP. However, the Minister has advised Gunns that he is satisfied with the content of these modules in so far as their material does not relate to or rely on the results of the hydrodynamic modelling.
EIMP Module L Precomissioning management 680 kB
  • 96 kB
  • 80 kB
  • 60 kB
  • 312 kB
  • 1.5 MB
  • 184 kB
EIMP Module M Monitoring 632 kB
  • 96 kB
  • 132 kB
  • 1.8 MB
EIMP Module N Remedial and Response Strategies 224 kB
  • 92 kB
The following preliminary study was completed by Dr M Herzfeld and provided to Gunns Limited. Gunns is now making this report available to the public.  
  • 5 MB
Please refer to the link below for the 2009 Bell Bay Pulp Mill EPBC Approval Annual Report. 
  • 1.2 MB